News

NRG has been working with the LIT-PHONON JSC successfully for more than two and a half years

09 февраля 2019

On 8 February 2019 after two and a half years of operation at LIT-PHONON, NRG equipment was inspected. The total power of the equipment designed for the site is over 3,000 kW. According to the results of the inspection, all equipment is in excellent condition and working properly.